sitelogo
 Home»Building Technology» Factors influencing material wastage on building construction site in Gombe metropolis

Factors influencing material wastage on building construction site in Gombe metropolis

 Department: Building Technology  
 By: usericon muhalhq  

 Project ID: 7665
   Rating:  (5.0) votes: 1
Rate this project
   Price:₦3000
Abstract
The study was carried out to critically investigate the factors influencing material wastage on building construction sites in the Gombe metropolis. To achieve this objective, three research questions were stated to guide this study. The data collected were analyzed using descriptive statistics and tables to analyze research questions. A structured questionnaire was used as the major instrument for data collection from the respondents in selected building sites in Gombe town. 60 questionnaires were distributed to professionals within the Gombe metropolis. 57 questionnaires were returned covering 95% and 3 were not returned covering 5%. After the careful analysis of the data, the following findings were revealed, material handling, availability of material, and type of project. Issuing of materials for use, are major cause of material wastage. The studies further reveal the factors causing material wastage which include, lack of proper work planning and scheduling, lack of security personnel and late delivery of ordered materials. This study also reveals the possibility of reducing wastage, such as Proper material handling, and determining the daily allocation of material on-site—provision of adequate storage of material etc. The study was concluded with some recommendations that, there should be a proper schedule of material management right from the inception to the completion of the project and strict compliance with the project bill of quantities, schedule of materials, as well as the construction program at large....
Preview +
Other Building Technology project topics and materials you might be interested in
»Causes of project abandonment in building construction industry and remedial measures
»Causes of construction project failures and abandonments in Nigeria
»Safety procedures and accident prevention methods in construction sites
»Control of Noise Pollution and Sound Insulation in Buildings ( A Case Study of a Broadcasting Studio)
»The implication and benefit of the use of softwares in building project construction (case study of selected software and firm)
»Maintenance and servicing problems of specialist works in building
»The effect of quality control in the building construction process (a case study of Afikpo, Ebonyi state)
»A study of prospects and problems of timber as external material in building production in hot climate region
»The impact of budgeting and budgetary control in construction project delivery in Nigeria
»Challenges of low-cost housing delivery in Nigeria (Case study of Imo state)
»Use of formwork design and construction of high building
»Project planning and programming as tools for effective project delivery
»The use of building survey for maintenance of building in Nigeria ( A case study of one storey building at Owerri, Imo state)
»Design and construction of office complex for school of environmental design technology
»Effects of labour management in building construction site - case study of Owerri, Imo state

Upload Project

Do you have project materials to share? Upload and earn with it.

Departments