sitelogo
 Home»Quantity Survey» Taking off processes and preparation of an un-priced bill of quantities

Taking off processes and preparation of an un-priced bill of quantities

 Department: Quantity Survey  
 By: usericon tboycity  

 Project ID: 2048
   Rating:  (3.3) votes: 6
Rate this project
   Price:₦1000
Abstract
Classwork alone on the measurement of building work is not enough to equip the student with the required knowledge and skill required on the measurement of building work, in accordance with the standard procedure laid down by BESMM3(Building& Engineering Standard Method of Measurement). It is against this background that the introduction of project work was introduced to expose the student to a practical and theoretical method of taking off of building work apart from class work so as to increase their skill and knowledge in addition to classwork. The chapter one of this project demonstrate the aims, objectives of this research and the scope and limitation while the chapter two and three represent a literature review on the procedure of measurement of building work in order to have a better understanding of taking off, abstracting and billing processes prepared in chapter four for the proposed four (4) bedroom fully detached duplex. ...
Preview +
Other Quantity Survey project topics and materials you might be interested in
»An examination of the role of value engineering analysis in the construction industry
»Risk management practice in construction project (a case study of Ebonyi state)
»Assessment of factors influencing time performance of building projects in Nigeria construction industry
»Appraisal of cost management practices in the delivery of capital projects in Nigeria
»Assessment of the environmental impact of construction works
»Productivity improvement of projects in the Nigerian construction industry
»The comparative analysis of recreational facilities for housing estates
»Estimating and budgeting a medium scale building project
»Involvement of quantity surveyor in railway construction project cost in the Nigerian railway corporation, Niger state
»Taking off processes and preparation of an un-priced bill of quantities
»The effects of existing bid selection on public buildings construction projects in Kaduna state
»An assessment of the participation of female quantity surveyor in professional practice in Bida and Minna areas of Niger state

UPLOAD A PROJECT

Do you have project materials to share? Upload and earn with it.

Departments