sitelogo
 Home»Building Technology» Design and construction of a three bedroom bungalow for a disabled low income earner

Design and construction of a three bedroom bungalow for a disabled low income earner

 Department: Building Technology  
 By: usericon samadchuks  

 Project ID: 5497
   Rating:  (3.3) votes: 6
Rate this project
   Price:₦3000
Abstract
Beginning from the age of human history and development, it is recorded that building construction presents one of the basic preoccupations who felt the need to provide themselves a safe place for habitation. This project focuses on the design and construction of a three-bedroom bungalow for a disabled low-income earner. The site for this proposed building is located at Amaeze in Obibiezena Owerri North Local Government Area, Imo State. The site proposed for the construction work measures is 450sqm. The main aim of this work is to design and construct a three-bedroom bungalow for a disabled low earner. This can be achieved through the following objectives to ensure that construction will be carried out properly to ensure the maintainability, functionality and serviceability of this building, to carry out the construction in a manner that people will appreciate and emulate the design and construction pattern. This work shows an estimated cost implication that will enable an interested client to prepare himself for future needs. The construction process was carried out according to the laid down building code of practice. The site was first of all cleared of all trees and shrubs, top soil excavation before the setting out, trench excavation and construction. A detailed work programme and maintenance schedule was shown. We conclude that the Building should conform to standards to avoid unplanned maintenance for disabled low-income earners and good measures of construction should be applied such as short stairs for the entrance and exit of the disabled owners....
Preview +
Other Building Technology project topics and materials you might be interested in
»Causes of project abandonment in building construction industry and remedial measures
»Causes of construction project failures and abandonments in Nigeria
»Safety procedures and accident prevention methods in construction sites
»Control of Noise Pollution and Sound Insulation in Buildings ( A Case Study of a Broadcasting Studio)
»The implication and benefit of the use of softwares in building project construction (case study of selected software and firm)
»Maintenance and servicing problems of specialist works in building
»A study of prospects and problems of timber as external material in building production in hot climate region
»The effect of quality control in the building construction process (a case study of Afikpo, Ebonyi state)
»The impact of budgeting and budgetary control in construction project delivery in Nigeria
»Project planning and programming as tools for effective project delivery
»The use of building survey for maintenance of building in Nigeria ( A case study of one storey building at Owerri, Imo state)
»Challenges of low-cost housing delivery in Nigeria (Case study of Imo state)
»Use of formwork design and construction of high building
»Effects of labour management in building construction site - case study of Owerri, Imo state
»Design and construction of office complex for school of environmental design technology

Upload Project

Do you have project materials to share? Upload and earn with it.

Departments