GSM controlled automatic sliding doorBy: mattkingsLevel: HNDRating: (3.3) votes: 15Added:Jul. 13, 2020 Hits: 855
Three phase (3-f) automatic change over switchBy: mattkingsLevel: HNDRating: (3.4) votes: 14Added:Jul. 13, 2020 Hits: 1,181
Programmable school bell timerBy: mattkingsLevel: HNDRating: (3.1) votes: 16Added:Jul. 13, 2020 Hits: 975
Fire alarm system using GSM telephone ringerBy: mattkingsLevel: HNDRating: (3.1) votes: 16Added:Jul. 13, 2020 Hits: 912
A design and construction of 2kva inverter systemBy: FabservizesLevel: BscRating: (3.3) votes: 12Added:Jun. 11, 2020 Hits: 913
Energy demand side managementBy: ultimeightLevel: NDRating: (3.3) votes: 12Added:Jun. 12, 2020 Hits: 1,071
Design and construction of 5kva power inverterBy: ultimeightLevel: HNDRating: (3.0) votes: 7Added:Jun. 8, 2020 Hits: 1,871
Construction of a led display board using Bluetooth moduleBy: harnubhoiLevel: NDRating: (3.2) votes: 11Added:Mar. 15, 2020 Hits: 1,121
Construction of a direct online starterBy: harnubhoiLevel: HNDRating: (3.3) votes: 10Added:Mar. 15, 2020 Hits: 1,544
Design and construction of electronic capacitor meterBy: EnnysholaLevel: NDRating: (3.2) votes: 11Added:Mar. 14, 2020 Hits: 1,175