Importance of timber in civil engineering construction Department: Civil Engineering By: mattkings Project ID: 1839 Rating: (3.2) votes: 19Rate this project12345 Price:Free Download MaterialAbstractThis project was carried out to determine the importance of timber in civil engineering construction. In the course of the project, a general procedure for the purpose of wood work construction was followed. The pieces of wood for the construction of the bookshelf were properly placed and made ready for setting out. The design of the bookshelf was carefully studied as well as the cutting list. However, during setting out stage, the joints, as well as the fitting, be made were marked out of the materials, this was followed by squaring and gauging from the face sides and edge. The waste edge and parts are sawn out for shaping and involve rebate, edge which is the most important stage was the stage that allows and involves fixing and joining parts and members of the work with glues and fastener. At this point, proper gauging and squaring were ensured before nailing and gluing.Finally, finishes were applied followed by the fixing of glasses and using holes for screw and planning....Preview Download Preview +Other Civil Engineering project topics and materials you might be interested in»Comparing the compressive strength of concrete made with sand as fine aggregate and with chipping dust as fine aggregate»The comparative study of the compressive strength of concrete made with granite to that made with river round stone (pebble) and local stone»The use of computer in civil engineering»Importance of timber in civil engineering construction»Construction and Installation of a Panel Door»Construction of wardrobe key study on wood work»Effect of street trading on traffic performance and control»Assessment of different types of foundation and their mode of construction»Comparison of soil bearing capacity of different locations in Imo state»Investigation into the suitability of sand and gravel materials commonly used in building construction»Investigating the effect of partial replacement of cement with eggshell powder in concrete production»An investigation in to the causes of cracks in building and possible solutions - a case study of Kukar Gesa community in Katsina metropolis»Determination of the causes, effects of environmental pollution and its possible control within Kwara and Osun state»Suitability of available laterite material in Ilorin East local government area for road construction»Model for prediction of rainfall intensity in Lagos