Design and construction of a four bedroom senior staff quarters with facilities Department: Building Technology By: bobyuzee Project ID: 5036 Rating: (5.0) votes: 1Rate this project12345 Price:₦2000 Get the Complete MaterialAbstractThis project research examines the effective direction of a proposed four bedroom senior quarters with facilities, the building identifies the various processes and stages that are involved and the stage of planning and execution which involves viability and feasibility study, including soil and site analysis, step plan and architectural working drawing, writing of construction program, and taking off, the use of the above documents in respect with its processes of actualization analysis inclusive the processes of planning and controlling with the construction site. The land tenure system and the traditional made of inherent influence some choice of building site during our investigation, we find out that the customs and beliefs of Federal Polytechnic Nekede staff is quite encouraging and their law is not against the project. ...Preview Download Preview +Other Building Technology project topics and materials you might be interested in»Causes of project abandonment in building construction industry and remedial measures»Causes of construction project failures and abandonments in Nigeria»Safety procedures and accident prevention methods in construction sites»Control of Noise Pollution and Sound Insulation in Buildings ( A Case Study of a Broadcasting Studio)»Maintenance and servicing problems of specialist works in building»The implication and benefit of the use of softwares in building project construction (case study of selected software and firm)»A study of prospects and problems of timber as external material in building production in hot climate region»The impact of budgeting and budgetary control in construction project delivery in Nigeria»The effect of quality control in the building construction process (a case study of Afikpo, Ebonyi state)»Project planning and programming as tools for effective project delivery»The use of building survey for maintenance of building in Nigeria ( A case study of one storey building at Owerri, Imo state)»Use of formwork design and construction of high building»Challenges of low-cost housing delivery in Nigeria (Case study of Imo state)»Effects of labour management in building construction site - case study of Owerri, Imo state»Design and construction of office complex for school of environmental design technology