sitelogo
 Home»Civil Engineering» Road deterioration - case study of the road leading from Naze junction to FUTO gate

Road deterioration - case study of the road leading from Naze junction to FUTO gate

 Department: Civil Engineering  
 By: usericon Arinze1  

 Project ID: 5408
   Rating:  (3.2) votes: 10
Rate this project
   Price:₦4000
Abstract
This project report is a study carried out to determine the causes and remedies to road deterioration. A case study of Naze Junction to Futo Gate Road. This study talks about the existence and development of tacks, research made to discover the causes and remedies of road deterioration, the road structure/road maintenances. This project covers the methods used to determine the cause of road deterioration by conducting soil tests and traffic census. It includes pictures of the deteriorated spots of the road. The result of the test done and their general analysis. It covers also the conclusion of the study causes, based on the literature search and results of experiments and finally the recommendation of the study. ...
Preview +
Other Civil Engineering project topics and materials you might be interested in
»Comparing the compressive strength of concrete made with sand as fine aggregate and with chipping dust as fine aggregate
»The comparative study of the compressive strength of concrete made with granite to that made with river round stone (pebble) and local stone
»The use of computer in civil engineering
»Importance of timber in civil engineering construction
»Construction and Installation of a Panel Door
»Construction of wardrobe key study on wood work
»Effect of street trading on traffic performance and control
»Assessment of different types of foundation and their mode of construction
»Comparison of soil bearing capacity of different locations in Imo state
»Investigation into the suitability of sand and gravel materials commonly used in building construction
»Investigating the effect of partial replacement of cement with eggshell powder in concrete production
»An investigation in to the causes of cracks in building and possible solutions - a case study of Kukar Gesa community in Katsina metropolis
»Suitability of available laterite material in Ilorin East local government area for road construction
»Determination of the causes, effects of environmental pollution and its possible control within Kwara and Osun state
»Model for prediction of rainfall intensity in Lagos

Upload Project

Do you have project materials to share? Upload and earn with it.

Departments